ADTRAN Tracer TRACER 2 x E1 Guide de l'utilisateur Page 25

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 319
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 24
Multi Protocol Test Set 13
3 Getting Started
Windows CE 6.0 is the baseline operating system software and is
pre-installed on the Sharp Tester. If the AXS-200/805/855 Multi Protocol Test
Set is not already installed, refer to the Sharp Tester User Guide for more
information on how to install the module.
Power Sources
The unit operates with the following power sources:
³ AC adapter/charger (connected to standard power outlet—indoor use
only). Compatible car outlet adapter available upon request.
³ One Lithium-Ion rechargeable batteries (automatically take over if you
disconnect the AC adapter/charger). Battery recharge is automatic
when the AC adapter/charger is connected.
Turning the Unit On
Turn on the AXS-200 by pressing the button. Refer to the AXS-200 User
Guide for more information.
Vue de la page 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 318 319

Commentaires sur ces manuels

Pas de commentaire